from $32,000

Kitchen Remodeling

Cabinetry, stone and a layout that finally works

See pricing
Kitchen with walnut cabinets and marble-look tile floor in Irvine
Kitchen remodelIrvine

Kitchens take longer than they should for one reason more than any other: the room gets torn out before anyone has ordered the cabinets. Then it sits empty for six weeks waiting on a delivery truck. We lock selections and order cabinetry before demolition starts, so the gutted phase is as short as it can be.

After that it is a sequence, and we run it with one crew. Demo, rough plumbing and electrical to the new layout, inspection, drywall and paint, cabinets, templating and installing the counters, backsplash, fixtures and appliances. You get the week each phase happens before the job starts, and one person to call when something changes.

Cabinetry is usually 35–40% of the budget, so that is where we spend the most time with you. Semi-custom lines cover most kitchens well; full custom makes sense for odd dimensions or where the cabinets are the architecture of the room. We price both so the decision is yours, made on real numbers.

1Pricing

Two ways this gets quoted

Turnkey pricing including demolition, all trades, permits where required, materials at trade cost and final cleanup. Cabinetry and stone selections drive most of the range.

  1. 2 / 2

    Custom Kitchen

    Full custom cabinetry, stone slabs and layout changes.

    • Walls moved or opened with structural work
    • Full custom cabinetry built to the room
    • Natural stone slabs and full-height backsplash
    • Island with plumbing or cooktop
    • Permits and inspections handled by us

    from$55,000

What drives the price: read the LA cost guide

2How it runs

Our kitchen remodel process

  1. Step 1 / 4

    Design and fixed quote

    We measure, talk through how you cook and use the room, and produce a layout with a line-item price. Selections are locked and cabinets ordered before demo so the budget does not drift.

  2. Step 2 / 4

    Demolition and rough-in

    Everything out, then plumbing and electrical roughed to the new layout. Anything we find behind the walls is photographed and priced before we go further.

  3. Step 3 / 4

    Cabinets, counters and backsplash

    Walls closed and painted, cabinets installed and leveled, counters templated and set, backsplash tiled. Fixtures, lighting and appliances are connected last.

  4. Step 4 / 4

    Punch list and handover

    We walk the kitchen with you and write down everything, however small. Nothing is called finished until that list is empty and you have signed it off.

“Eight weeks, one point of contact, and a written schedule I could actually plan around. The cabinets were ordered before demo so we never sat looking at a gutted kitchen waiting on a truck.”
David H. – Studio City

3FAQ

Kitchen Remodel questions

The things people ask before they book. If yours is not here, call and ask it.

(213) 375-0868
  • Kitchens start at $32,000 for semi-custom cabinetry, quartz counters and new electrical, and run to $85,000 for full custom cabinetry, stone slabs and structural layout changes. Cabinetry alone is usually 35–40% of the total, so that is the decision that moves the number most.

5Free estimate

Get a fixed price for kitchen remodel

Turnkey pricing including demolition, all trades, permits where required, materials at trade cost and final cleanup. Cabinetry and stone selections drive most of the range. Free walkthrough, written quote, no follow-up sales calls.