Recent work

Scope, duration, cost

Photos on their own prove very little. Every project below carries what it involved, how long it took and what the client paid — because that combination is the only thing that tells you whether a contractor is a fit.

  • Post-war ranch, repainted top to bottom — Interior Painting in EncinoEncino
    Interior Painting

    Post-war ranch, repainted top to bottom

    Popcorn ceilings scraped and skimmed flat, then the entire interior repainted in a warm off-white with sprayed enamel trim.

    • The ceilings tested negative for asbestos, so we scraped and skimmed all 2,400 square feet flat before any colour went up.
    • Trim and doors were sprayed rather than brushed, which is the difference visible in the photos — no brush marks anywhere along the casings.
    Scope
    2,400 sq ft · walls, ceilings, trim and doors
    Duration
    6 days
    Cost
    $9,400
  • 1950s hall bath, same footprint, entirely rebuilt — Kitchen & Bathroom Remodeling in Sherman OaksSherman Oaks
    Kitchen & Bathroom Remodeling

    1950s hall bath, same footprint, entirely rebuilt

    Original 1953 tile out, waterproofing membrane and flood test in, large-format porcelain and a floating vanity back.

    • Nothing moved, which kept the plumbing cost down and the whole project under twenty-two thousand.
    • The subfloor under the old shower pan had rotted through — found on day one, repaired, photographed and priced before we carried on.
    Scope
    5x8 bathroom · full gut and rebuild
    Duration
    3 weeks
    Cost
    $21,800
  • Leaking rear addition sealed for a fifth of a tear-off — Flat Roof Coating in BurbankBurbank
    Flat Roof Coating

    Leaking rear addition sealed for a fifth of a tear-off

    Two saturated insulation sections replaced, every seam fabric-reinforced, then a full elastomeric coating with a 10-year warranty.

    • The homeowner had been quoted $26,000 for a tear-off. The deck was sound — only the insulation at two low points was wet.
    • Water had been standing at the rear parapet, so the low spot was re-sloped to the drain before a drop of coating went on. Sealing over a puddle only buys a couple of years.
    Scope
    1,150 sq ft flat roof · elastomeric system
    Duration
    3 days
    Cost
    $7,900
  • Original 1940s oak found under the carpet — Flooring Installation in Culver CityCulver City
    Flooring Installation

    Original 1940s oak found under the carpet

    Carpet pulled to reveal old-growth white oak in good condition. Sanded, stained natural and finished in matte polyurethane.

    • New engineered hardwood over the same area would have been about $12,600 and a worse floor. Refinishing cost roughly half.
    • We always pull a corner of carpet before quoting flooring in pre-1950 Culver City homes for exactly this reason.
    Scope
    1,100 sq ft · sand and refinish
    Duration
    4 days
    Cost
    $6,600
  • Craftsman plaster repaired as plaster — Drywall & Plastering in PasadenaPasadena
    Drywall & Plastering

    Craftsman plaster repaired as plaster

    Loose plaster keys re-anchored to the original lath, cracks bridged, walls skimmed, and the box beams stripped and refinished.

    • A previous contractor had filled these cracks with joint compound. All of it had popped back out within two years.
    • Re-keying plaster to lath is slow work, but it is the only repair on a Craftsman wall that stays put.
    Scope
    Living and dining rooms · plaster repair and repaint
    Duration
    8 days
    Cost
    $8,200
  • 220 feet of cedar, set to last twenty years — Fence Repair & Installation in Woodland HillsWoodland Hills
    Fence Repair & Installation

    220 feet of cedar, set to last twenty years

    Old leaning pine fence removed, posts reset 30 inches deep in crowned concrete over gravel, cedar pickets and braced gates.

    • The failed fence had posts set 14 inches deep straight into dirt. Every one of them had rotted at grade.
    • Both gates were built with diagonal bracing and adjustable hardware so they can be trued up rather than replaced when the ground moves.
    Scope
    220 linear ft · 6 ft cedar with two gates
    Duration
    4 days
    Cost
    $11,400
  • Kitchen opened to the living room — Kitchen & Bathroom Remodeling in Studio CityStudio City
    Kitchen & Bathroom Remodeling

    Kitchen opened to the living room

    Non-structural wall removed, full custom cabinetry to the ceiling, waterfall quartz island and all new electrical.

    • Cabinetry was ordered before demolition day, so the kitchen was never sitting gutted waiting on a delivery.
    • Permits covered the electrical and the wall removal. Both inspections passed first time.
    Scope
    Full kitchen · wall removal, custom cabinetry, quartz
    Duration
    8 weeks
    Cost
    $68,000
  • Duplex turned over between tenants in nine days — Interior Painting in GlendaleGlendale
    Interior Painting

    Duplex turned over between tenants in nine days

    Both units repainted, forty-plus wall repairs made invisible, and worn carpet replaced with waterproof luxury vinyl throughout.

    • The owner had a tenant moving in on a fixed date. We ran both units in parallel with two crews to hit it.
    • Luxury vinyl rather than carpet because it survives turnovers — the same floor will still be serviceable in three tenancies.
    Scope
    Two units · paint, drywall repair and vinyl plank
    Duration
    9 days
    Cost
    $18,300

Before and after

Drag to compare

Same room, same angle, same lens. Drag the handle across, or use the arrow keys.

Popcorn ceiling removal and repaint in Encino, after Fresh Build completed the work
Popcorn ceiling removal and repaint in Encino, before work started
BeforeAfter

Popcorn ceiling removal and repaint

EncinoCeilings skimmed flat, walls and trim repainted. Six days.

1950s hall bathroom, same footprint in Sherman Oaks, after Fresh Build completed the work
1950s hall bathroom, same footprint in Sherman Oaks, before work started
BeforeAfter

1950s hall bathroom, same footprint

Sherman OaksFull gut, new waterproofing and flood test. Three weeks.

Original oak uncovered and refinished in Culver City, after Fresh Build completed the work
Original oak uncovered and refinished in Culver City, before work started
BeforeAfter

Original oak uncovered and refinished

Culver CityCarpet out, old-growth oak sanded and sealed. Four days.

Free estimate

Want yours on this page?

Free walkthrough and a written fixed price. Most quotes go out the same day we visit.

(213) 375-0868

Calls answered 24/7

CA License #1166332 — licensed, bonded and insured