Bathroom remodel prices in Los Angeles
The figures below come from our own written quotes across Los Angeles, Orange and Ventura counties, not from a national survey. Every price is turnkey: demolition, all trades, permits where the work needs them, materials at trade cost and final cleanup. Tile, glass and the vanity drive most of the range.
| Scope | What it includes | Typical price |
|---|---|---|
| Bathroom refresh, same layout | Full demo of tile, vanity and fixtures; new waterproofing and shower pan with a 24-hour flood test; floor and shower tile; new vanity, toilet, fixtures and lighting; paint and finish carpentry | From $15,000, most land at $17,000–$26,000 |
| Full remodel, new layout | Plumbing relocated; curbless or frameless glass shower; heated floors, niches and bench seating; custom vanity with a stone top; permits and inspections | From $28,000, up to about $45,000 |
| Real job: Sherman Oaks hall bath | 5x8 room, original 1953 tile out, full gut and rebuild in the same footprint, large-format porcelain, floating vanity | $21,800, three weeks |
National averages look far lower, and they are not a useful yardstick in LA. HomeAdvisor puts the typical US bathroom remodel at about $12,151, and the same page notes that a project costing $20,000 in Alabama might cost around $30,000 in California with the same materials and the same time on site (HomeAdvisor (opens in a new tab), checked September 2026). Compare LA quotes with other LA quotes, and compare them line by line.
What drives the cost of a bathroom remodel
Two bathrooms of the same size can be $15,000 apart. Almost all of that difference comes from five decisions, and most of them are made before anyone swings a hammer.
1. Whether anything moves
Keeping the toilet, vanity and shower where they are is the biggest single saving in bathroom work. The moment plumbing or electrical moves, a circuit is added or a wall changes, the job needs a permit and an inspection, and the drain and supply lines have to be rerouted through the floor or the wall. That is most of the step from the $15,000 tier to the $28,000 tier.
2. The shower you build
A tub-to-shower conversion is one of the most common jobs we do: the tub comes out, the drain is moved and re-sloped, and the new shower gets a full waterproofing system. A curbless shower goes further, because the floor has to be lowered so water runs to the drain without a step. Frameless glass, built-in niches and a bench each add material and hours on top.
3. Tile, glass and the vanity
These three drive most of the range inside each tier. Large-format porcelain covers a wall with fewer joints and fewer cuts than a small mosaic. Tiling the shower to the ceiling costs more than tiling to the showerhead. A stock vanity is a different line item from a custom vanity with a stone countertop. We buy tile, stone and fixtures at trade pricing and pass that on, but the choice itself is still the biggest lever you hold.
4. What is behind the walls
Older houses hide things. On the Sherman Oaks hall bath the subfloor under the old shower pan had rotted through. We found it on day one, repaired it, photographed it and priced it before carrying on, and the job still came in under twenty-two thousand. That is how hidden damage should be handled: shown to you and priced in writing before anyone keeps working.
Homes built before 1978 may have lead paint on walls, trim and window frames. Once a job disturbs more than six square feet of painted surface in a room, the federal Renovation, Repair and Painting rule applies and the work has to be done lead-safe by a certified firm (EPA (opens in a new tab), checked September 2026). We are an EPA Lead-Safe certified firm, and the containment is part of the quote rather than a surprise.
5. Waterproofing done properly
This is the part you never see and the only part that can quietly ruin the room. Every shower we build gets a membrane on the walls and pan and a 24-hour flood test before a single tile goes on: drain plugged, pan filled, water left for a full day to prove it holds. It is included in every price above. Skipping it is common, and it is why so many five-year-old showers are rotting the subfloor underneath.
How long a bathroom remodel takes
Two to four weeks for most bathrooms. A same-layout refresh sits at the short end; moving plumbing or walls adds an inspection and pushes it towards four. The order does not change: demolition, rough plumbing and electrical, inspection where needed, waterproofing and flood test, tile, then vanity, toilet, fixtures, lighting and glass, with paint last.
If it is your only bathroom, say so at the walkthrough. We sequence the job to keep the toilet working for as many nights as possible.
How to keep the cost of a bathroom remodel down
- Keep the layout. Same footprint, same drain positions. It is the difference between the two tiers above, and the Sherman Oaks bath shows what a same-layout rebuild can look like for $21,800.
- Choose everything before demolition. Tile, vanity and fixtures picked and priced up front mean the budget does not drift while the room sits open.
- Spend on the shower, save on the walls. Tile the wet areas properly and paint the rest of the room. Paint costs far less per square foot than tile and does its job outside the splash zone.
- Pick porcelain over natural stone. It gives you a stone look at a lower material cost and asks for less upkeep.
- Get a fixed written price, not allowances. An allowance is a guess that turns into a change order. Our quotes are line-item and fixed, and the number only moves if you change the scope or we find hidden damage, which we photograph and price before touching.
- Keep the deposit small. California caps a home improvement down payment at $1,000 or 10 percent of the contract price, whichever is less, and later payments cannot run ahead of the work done (CSLB (opens in a new tab), checked September 2026). A contractor asking for more upfront is telling you something.
Getting a fixed price for your bathroom
We measure, talk through how you use the room and send a layout with a line-item fixed price. Tile, vanity and fixtures are chosen before demo, permits and inspections are handled by us, and the work carries our five-year workmanship warranty. See the full scope and process on our bathroom remodeling page, or look at finished jobs with their real costs on our work page.